FLUORSPAR DE-BOTTLENECKING
Location: New Foundland, Canada
Scope: Design and Implementation of De-Bottlenecking Program
Process: DMS/Comminution/Flotation
Client: Canda Fluorspar Inc.
Year: 2019-2020
The processing plant constructed and commissioned differed greatly from that developed during the Feasibility Study and was under achieving in throughput, production and efficiencies.
Scope of work included:
-
Development and management of a comprehensive rectification program
-
Implementing changes to the Dense Media Separation (DMS)
-
The introduction of a “Fines” classification circuit
-
Optimizing ball mill circuit (increased throughput to 120% of nameplate)
-
A complete re-configuring desliming cyclone circuit.
-
Introduction of froth pumps to replace poorly designed gravity flow system
-
Replaced thickener underflow pumps and improved operating performance
-
Interim Plant Manager (during recruitment search)